I have spent a lot of time trying to figure this out as I thought it was on my end.
If you use a calc to set a date and time in the future, and then update a date field, the time will not be included unless the “require time” toggle is required.
Quick steps to replicate:
- Use this time date snippet from the docs:
- add to a calculation
- manually update a date field with time required toggle off